Live on commercial plants · Singapore & Kuala Lumpur

AI-optimized control for the world's chiller plants.

One reinforcement-learned cooling brain, two deployment surfaces. Live today on commercial plants across Singapore and Malaysia — cutting energy 10–17% with M&V-audited savings.

LIVE Kelvix Control — commercial chiller plants
IN DEV Kelvix Split — light commercial AC
0%
verified kWh reduction on live plants
0
saved per year across reference plants
0
continuous operating history
0
avoided per year, and counting
The Problem

Cooling is SEA's largest, dumbest energy load.

30–40%
of Southeast Asia's commercial power goes to cooling

Chiller plants alone account for 60–70% of that load in commercial real estate — yet most run on control logic from the 1990s.

Chillers run blind, the BMS is dumb

Most plants idle at 0.85–1.1 kW/RT — 30–40% above best-in-class 0.55 kW/RT. Fixed setpoints, poor ΔT, rule-based controls that never adapt.

🏪

Light commercial has no tooling at all

500k+ SMEs across SG+MY — kopitiams, F&B chains, clinics, salons, strata offices — run split AC with no telemetry, no scheduling, no fault detection. Bills inflated 20–40%.

📈

Net-zero pressure is now mandatory

BCA Green Mark 2021, MAS climate disclosures, Malaysia EECA 2024, Bursa Sustainability — operators must measurably cut kWh and tCO₂e by 2030.

Sources: IEA Future of Cooling 2024 · BCA energy benchmarks · EMA Singapore Energy Statistics.

The Solution

One AI cooling brain. Two deployment surfaces.

The Kelvix Engine — a single reinforcement-learned control engine for setpoint, scheduling, sequencing and fault models — calibrated continuously against tropical-climate cooling loads from every Kelvix-managed asset.

The Kelvix
Engine

Kelvix Control

LIVE

Closed-loop AI for commercial chiller plants

Flagship product, deployed today. Optimal setpoint, sequencing and reset across compressors, pumps and cooling towers. 10–17% kWh reduction with M&V-audited savings under IPMVP Option C.

Kelvix Split

IN DEV

Light commercial split AC optimization

Same AI engine, ported to a $50 IR / Modbus controller for kopitiams, F&B, clinics, retail and strata offices. Fleet SaaS for property managers — sharing one data backbone with the chiller product.

Kelvix Control runs live on Trane, Carrier, York, Daikin and Dunham Bush plants — vendor-agnostic optimization written straight back to the BMS.

Why Now

Four forces are converging in SEA — right now.

01

Johor + SG data-center boom

Singapore's DC moratorium lifted with green requirements (PUE ≤ 1.3). Equinix, GDS, YTL, NTT and K2 are building 2+ GW of IT load in Johor by 2028 — all cooling-bound.

02

Regulation just got real

BCA Green Mark 2021 mandatory benchmarking, EECA Malaysia 2024, MAS TCFD-aligned climate disclosure, Bursa CSRD reporting.

03

Cooling-control ML is now ready

Phaidra, BrainBox AI and DeepMind-on-Google-DC have validated RL for HVAC in production. Time-series foundation models, BACnet parsing and physics-informed nets exist off the shelf.

04

Refrigerant + heat compounding

Kigali HFC phase-down and rising wet-bulb temps degrade chiller efficiency structurally every year. SEA tariffs are up 20–40% since 2022. Doing nothing gets worse, not flat.

The window 2026–2028. Regulation deadlines, the capex cycle and ML maturity all arrive together.
How Kelvix Control Works

Sense the plant. Decide every five seconds. Verify the savings.

01 · Sense

Telemetry & sensors

BACnet / Modbus / OPC-UA tap on the chiller plant plus RHT sensors on supply/return air. 5-second sample rate captures load, weather, occupancy and plant state.

02 · Decide

The Kelvix Engine

An RL agent trained on tropical cooling loads predicts plant load 30 minutes ahead and solves for minimum kWh/RT — subject to comfort and equipment constraints.

03 · Control

Plant write-back

Writes optimal CHWST / CWST / staging / sequencing to the BMS. Modulates compressor FLA, chiller cycling, pump and cooling-tower fan VFDs every cycle.

04 · Verify

M&V savings ledger

IPMVP Option C baseline. A monthly audited report shows kWh saved, $-equivalent and tCO₂e avoided. Performance-share invoiced against the verified ledger.

The outcome: 10–17% kWh reduction on verified plants, stabilising from month 3, full performance by month 6. Vendor-agnostic across Trane, Carrier, York, Daikin and Dunham Bush. Audited every month, payable from savings.

Why It Matters

Cooling is the biggest line item you can actually cut.

No new chillers, no downtime, no capex. The savings are already sitting in your plant — locked up in setpoints and sequencing that haven't changed in years.

Your energy bill
30–40%

of a typical commercial building's power goes to cooling — and chiller plants are 60–70% of that. Every point of efficiency is money straight off the bill.

Compliance by 2030
Mandatory

BCA Green Mark, MAS climate disclosure, Malaysia EECA and Bursa reporting require measurable kWh and tCO₂e cuts. Kelvix hands you an audited ledger to prove them.

Where Kelvix runs

🏢
Commercial & strata offices
🛍️
Retail malls & F&B chains
🏨
Hotels & hospitals
🖥️
Data centers (SG + JB)
🏭
Factories & wafer fabs
🌐
District cooling networks

Sources: IEA Future of Cooling 2024 · BCA energy benchmarks · EMA Singapore Energy Statistics 2024.

Reference Deployments

Live plants. Verified savings. Multi-year operating data.

Reference plants operated by the Kelvix team under prior chiller-optimization work in Malaysia — same AI engine, same M&V methodology. Multi-year data available on request under NDA.

Commercial · Office

TNB Jalan Timur

Scope
Comfort cooling · Trane + Dunham Bush · 500 / 1,260 / 2,800 RT
Deal
Live since June 2018 (expansions 2022, 2024)
Result
15% avg savings · 76 MWh/yr · 53 tCO₂e/yr
Status
Independently verified by UNITEN
Industrial · Electronics

Computime Electronics Factory

Scope
Process cooling 24/7 · Trane / Daikin / York / Carrier · 800–1,550 RT
Deal
Live since Dec 2020 (expansion March 2024)
Result
10% avg savings · 54 MWh/yr · 38 tCO₂e/yr
Status
Stabilised after month 6; finance-validated
Industrial · Wafer Fab

MIMOS Wafer Fab

Scope
Wafer fab process cooling 24/7 · York / Carrier · 1,550 RT (800 RT duty)
Deal
Live since Dec 2020
Result
16.3% YTD avg · 10–15% monthly savings
Status
Consistent record over 5+ years
10–17%verified kWh reduction
≈130 MWhsaved per year
90 tCO₂eavoided per year
6 yr+continuous operating history
Team

Cooling expertise meets infrastructure execution.

N

Nivashini

Co-founder & CEO · Chief Cooling Officer

Nivashini has spent her career inside plant rooms and facilities — watching, up close, how much energy gets wasted. Chillers running at part-load 80% of the time. Plants oversized by 40% on day one. Setpoints nobody has touched in years.

That waste is personal. Kelvix is what she's spent a decade preparing to build: the AI brain that finally treats cooling like the engineering problem it is.

Cooling systemsChiller opsAuditingM&V
T

Thani

Co-founder & CTO

Civil + Environmental Engineering with years on global infrastructure across APAC and the Middle East. 17+ years of chiller-optimization deployments across Malaysia, Singapore, Hong Kong and Thailand — 50M sqft under management, 60+ client portfolio, third-party audited (UNITEN).

He's the systems and execution leader: shipping software that lives inside live mechanical plants and hardening it for legacy BACnet, contractor handovers and 25-year asset life.

17+ yrs cooling50M sqftBACnet/ModbusField at scale
The wedge Nivashini knows cooling inside-out. Thani knows how to ship infrastructure at global scale.
Vision

The control layer for tropical cooling.

Every chiller plant in APAC, today. Every split AC and district network, next.

1.2 GW
tropical cooling under management by 2031
1.4 TWh
kWh saved per year at scale (≈ 720k tCO₂e)
10–17%
verified energy cut on every live plant

Let's talk.

Cut your cooling energy 10–17% with M&V-audited savings — paid from what you save. Building operators, property managers and partners: book a 30-day proof-of-value.